The tube isn't the problem. Among various problems include: the building access roads to every pylon base, conducting site surveys and environmental impact studies for each site then figuring out what to do when those studies and surveys declare a patch of dirt to be unacceptable. The original route was also going to need something on the order of kilometers of tunnel through mountains.