The Question: How can one increase the occurrence of experience?
My Theory: Knowing that experience is gained over time through exposure to new concepts and information, I feel it is safe to say that the initial ramp up on technology is the most valuable during a project despite its size. Perhaps, instead of spending extra time on the downward slope of learning something, it is at that time safe to move towards a new project, resulting in a ramp-up occurring much sooner (tying into the time aspect).
I look forward to your thoughts.