Well, yeah. I suppose it would be. I'm a bit surprised this is a surprise to the landlord. Also, many of the costs here are looming anyways. It's a matter of when, not if, the electrical needs updating to meet code.
I see this all the time. “Investors” buy real estate by assuming repairs and maintenance to be minimal and then pocketing every dime of excess cash created by the property. Then, over time when the windows need to be replaced or the roof or the electrical system upgraded or the HVAC improved, they don’t have any budget for it because they’ve become used to living off all of the income (despite the fact that over their 10-20 years of ownership they’ve seen rents increase dramatically). So what do they do? They list it for sale at high current market rents as if all of this deferred maintenance / Capex has been completed. This puts buyers in a position of paying a massive purchase price and having massive costs to renovate / upgrade.
I hate landlords like this. Fortunately you can spot them a mile away. If the paint is peeling, then the electrical isn’t to code.
You also have to remember that it takes a lot of power to be able to change an EV in timely manner. It is easily the number one consumer of energy. Older neighborhoods utilities where never designed to do that.
That is definitely not true. An 80 year old house might not even have grounded outlets, let alone GFCI or AFCI protected outlets.
> You also have to remember that it takes a lot of power to be able to change an EV in timely manner
Nobody worries about how many electric ovens, clothes dryers, or air conditioners are in an older neighborhood. 240V at 30A is a trivial load addition, and even if it were to become a concern, there are existing mechanisms to shed load during peak usage. Even a crude cut-off switch, like many air conditioners have, would be sufficient.
It's always painful trying to have discussions related to any kind of physical infrastructure on HN because it's absolutely full of people that assume that physical design and maintenance is somehow the trivial, easy part.
The exterior service disconnect rule added in 2020 is safety related, it’s so firefighters can kill electrical power to a home from the outside to make it safe to enter. It has nothing to do with the utility.
33 miles a day of electricity is not that much, something like 7.6 KwH per day. For perspective AC units use from 0.5 to 5 KwH per hour.
Is it a difference, yes. However most EVs charge off peak, and would go even more off peak with a financial incentive. I set mine to start charging at 11pm when it's the cheapest rate, which nicely offsets AC use which is heaviest in the afternoon.
Mandating ripping out immediately everything dangerous or carcinogenic, would be even bigger issue. And these things don't cause actually so many issues to be very life threatening. They have been around for decades after all.
municipalities lack consensus for any other outcome to occur, they are all land fiefdoms.
But I wouldn't be surprised if the 2023 (maybe 2026) NEC will require at least 30A 240V service to garages with electrical service.
It still works right? Great, let's add another excuse to increase the rent and we're golden!
I haven't been keeping up on all the new NEC requirements for shoving xxCI's in various places, but I can see no rationale for this one. There is no such thing as 240 volts to ground in a home - it's all 120V (that's RMS, it's 170V peak), with a "240" outlet being both line phases (say +120 and -120 at a given point in time, giving a differential of 240).
Touching a residential "240 volt" line for a dryer or stove will give you the same exact shock as touching a common 120 volt line. The risk of 240 volt circuits is that they are generally of higher ampacity, and will thus have a much higher arc current. A GFCI does absolutely nothing to mitigate this!
Honestly they would have been better mandating the garage 120v receptacles be GFCI even though they're above grade, because people tend to do things like plug extension cords into them for use outside. 240 volt receptacles generally have a dedicated purpose, like a car charger.
We did TWO Teslas in an apartment for two years sharing (alternating cars) a single plug of a single 110 outlet. It was fine. With this arrangement, yes, on days where you do big trips, there’s a supercharger visit, But normally, an outlet is totally sufficient.
An installed charger does add some very, very minor convenience (no adapter, big deal… not worth the cost). And if it needs to be shared and bills split, that’s different. But for basic charging no special installation is needed as long as you can reach.
I made this second copy of my comment because while profanity (in the other comment) makes some people take notice, it gives others the excuse they need to tune out the message, which is the same for both comments:
You don't need to install a charger.
300+ miles of range is plenty to get to a nearby city and back for most people, with or without supercharging.
The “very, very minor inconvenience” I referred to is the non-issue of having to find something to coil the cord onto when not in use, solved by most installed chargers which give you an hanging hook. BFD.
Imagine your gas car increased it's range by 50 miles every time you came home for the night. How often would you fill up your gas tank?
For me it was much rarer than I expected. Sure longer road trips over 300 miles I'd often spend 15 minutes getting 140 miles of extra range. How far away are these hikes or cities?
I spent something like 10x less time charging on the road than I used to for gas and oil, so I consider that a huge win. Even driving from Sacramento Area to Denver area wasn't a big deal. Drive for 4-5 hours, stop and grab a snack and walk the dog and back into the car. Sure I had to wait an extra 10 minutes before driving for another 4-5 hours. I'd much rather do that than have to hit a gas station weekly ish.
Now, obviously some panels don’t have the space, or the service to the house isn’t enough amps but if that’s a case why aren’t you upgrading a 50 year-old electrical panel anyway? It sounds like OP had a bunch of deferred electrical maintenance to begin with but wants to blame it on EVs.
And an earth rod, right?
Anyone can stick a breaker in, run some cable, but it takes the rocket scientists to consider neutral fault conditions, causing potential between your home, charger, car and literal earth.
It might not apply to you. Your charger might have built in protection (many don't) or your supply might be grounded to the literal earth… but this is why we have building regs and people to follow them. Even if you do the work, it's worth a chat with a qualified electrician, and to have them inspect your work. It could save your life.
To correctly add more grounding rods in multiple locations would require a common ground bus where all grounding rods are inter-connected to an oversized grounding bus cable or bus bar that is independent of the circuit panel wiring. This is rare to find in a home however. This is more common in industrial buildings that have high power and high voltage equipment. In this setup every grounding rod has to be independently tested with a megger prior to being connected to the bus.
Regardless of what people will continue to claim, a 110V 15A outlet is really not enough. It's possible if you live your life on a strict schedule, drive very little, are very diligent about keeping your car plugged in, and don't mind having to go to a public charger routinely to sit for half an hour because you couldn't be bothered to hire an electrician one time to make the situation better for you in any possible way.
This doesn't seem to be particularly strict or diligent and it's based around average driving mileage. Our house came with an L2 charger box, but we drive much less than average in the US and it feels wasted on us. I run the charger once every 2-3 weeks or so and I'm fine.
[1]: https://smartfinancial.com/average-miles-driven-per-year
* Take a trip ~150mi round trip to a nearby town.
* Return home with car at relatively low state of charge (since, I started with ~80% SOC).
* Immediately next morning, I need to take a trip ~200mi
Couldn't do it if I was charging using 120V. I could do it even with relatively wimpy 240V (20A), though.
I charge at work, and L1 charging was fine for me when I was WFH during covid. I don't bother using outside chargers because L2 is too slow for short trips and fast charging is expensive.
You. Do. Fucking. Not. Need. An EV charger, to charge your EV. A 110 or 220 outlet with a cord and an adapter will work just fine. Apologies for the US centric terminology but I expect the situation is roughly the same (though numbers vary) elsewhere.
We did TWO Teslas in an apartment for two years sharing (alternating cars) a single plug of a single 110 outlet. It was fine. Yes, on days where you do big trips, there’s a supercharger visit, But normally, an outlet is totally sufficient.
An installed charger does add some very, very minor convenience (no adapter, big deal… not worth the cost). And if it needs to be shared and bills split, that’s different. But for basic charging no special installation is needed as long as you can reach.
Their daily commute is less than 100km so they have no problems charging the batts with their granny charger.
In our household we have one to four ~90% capacity commutes per week and being able to always get a full charge with the 11kW charger helps a lot.
So YMMV. I agree with you. Especially agree with the point that people should analyze their usage, maybe get some experience living with an EV and never give up on the first mental hurdle without even trying.
This has two benefits: it is cheaper to charge and the grid works more efficiently — price is lower when the demand is low and/or production is high.
200 miles a day is not the median driving pattern. It's closer to 30 miles
So my caveat to your claim would be: only if your EV itself has enough range, which means you're limited to newer EVs, rather than buying older ones on the second hand market that were manufactured with less range (and by now probably only have ~80% of their original, lesser range, remaining).
That it's been working for you for a few years does not invalidate this point, in the same way as not wearing a seat belt is unsafe.
3 miles per hour of charging is simply not enough. 12h x 3mph = 36mi range added, and that's not enough to reliably expect even a 30 mile roundtrip, let alone any errands you might run. I'd say we go through easily 55-60 miles of range for a 42mi commute. Plus, you're charging at peak hours for part of that.
Obviously I'm not saying you're lying, you did it, that's great, but you sure weren't driving many miles in both cars.
I plan to add a charger to my rental property, either when my current tenant buys an EV or when they move out (to avoid disrupting them). The home is fairly new and was built with 200 amp service so I don't anticipate any permit problems. The idea is to differentiate my property in the marketplace and justify a higher rent.
What I don't want is a tenant running a homemade 240v cable to the outlet for the electric clothes dryer and manually plugging/unplugging back & forth. That's unsafe.
[1] The fire department will pull the meter when they arrive and start fighting a fire, so they aren't spraying water on live circuits.
You’re correct, you don’t need to move the panels, but you do need to provide a emergency service disconnect on the exterior of the house. You could leave all the existing branch wiring in place, assuming it is up to code, and refeed the existing panels from the new service entrance location. The relevant code section in the NEC is 230.85, added in 2020.
A large portion of the cost is new panels with AFCI and GFCI breakers, they’re $50-100 each for a 15A 1p breaker, probably $1500-2500 for each panel.
> We recently decided to update our duplex’s electric system.
I'm left wondering what exactly they meant by "update our duplex's electric system" if they did not mean put in a new service, new main panel, and bring the branch circuits up to current code? Like what were they actually envisioning doing, that did not include redoing the branch circuits?
If this story were written with the electric vehicle precipitating the chain of events, I can see how that would be frustrating. But it seems they set out to do the updates, and are now complaining about doing the updates?
The utility's position seems wholly unreasonable though. If this weren't a rental property, the right answer would be to DIY the install and make the utility deal with the additional load on the distribution infrastructure.
Most level 2 chargers have a 20+ foot cord. I did the plug/unplug thing while I waited to install the plug in my garage, but my dryer is just inside of the door to the garage. Perhaps you're talking about a much longer run, but even with a proper extension cord (often less than $100), it should be fine.
There are some EV fleets for which charging downtime is not palatable (taxis in busy cities, for example). Swappable batteries have been developed and are being used by some of those fleets.
The next step is standardization of swappable batteries, and divestment of battery swapping and maintenance into a separate company from fleet operation. The third step is the separate company offering services to the public.
As vehicles built for these fleets are sold used, they will spread to households.
Then we are back to "gas" stations/service stations.
The logic seems sound. Rather than having to build charging complexity into every vehicle, and supply tens of millions or hundreds of millions of chargers, charging can be done at merely hundreds of thousands of charging stations, with the customer having a three minute trip through something like a car wash booth.
The title should be "what? You do really need a pesky netural wire for EV charging, who knew"?
Situations differ. Local policies and code differ. For a couple thousand dollars, my car will be fully sun powered (from our 11Kwh rooftop solar system). Gas savings over the life of the car should more than make up for it.
(We had previously upgraded our panel to handle more load and offer more slots when we renovated, but even that was under $3k.)
IMO the solution is top down and should require public planning to scale infrastructure to desired standards in a planned way. It should also require updates to modern code rather than allowing older and probably unsafe (code changed for good reason) buildings around until they fail (usually in a catastrophic way).
It's also bad that there aren't good ways to save for such updates, far too often short term needs prevail rather than doing things right the first time. I'm not sure if taxes to encourage and fund improvements or ways of saving money tax free towards major expenditures (which are then taxed at that time) are better, but there should be some process.
Eg if the door lintel is made from wood. Does it pass certification to say it can take that weight. To find out if the lintel is even wood requires removing plaster.
What happens if you wanted to tighten the specs on concrete? Are you going to tear down every pre existing concrete building because they can't demonstrate it was made to the new specs.
Probably this wouldn't be enough if every renter was a heavy EV user, but it could be good for a few years, and also would be useful for power outages and to take advantage of off-peak rates in future
Metering and payment would be an issue, but it should be possible to find a solution for that
Can EVs become more common without tenants being able to charge them ?
Obviously, it depends on the tenant's daily commutes especially, but at today's ranges a giant median chunk of US daily commuters could fast charge only once a week and meet their commute needs easily, with no other charges in between.
Home chargers are incredibly useful and a game changer, but also destination chargers (chargers at work or grocery stores or malls or other places where cars are parked for multiple hours) are also similarly game changers. Just having one or the other reduces (and in some cases eliminates) the need for any "fast" charges. But EVs themselves don't "require" any specific charging configuration and compared to gas have more options than ever before with home and destination options.
Stop by the "gas" station, open up the hood, grab your drained battery cell cards, bring them in, and pay for fully-charged cell cards to swap in.
The "gas" station can then charge the cards you brought and give them to another customer.
It's worth noting that, under this scheme, battery life can be monitored and manufacturers can recycle/replace EOL cards when the "gas" station sends them in.
No more waiting for the car to be charged. No more changes to homes. Just use the existing infrastructure! It's a win-win.
We can't even roll broadband out properly let alone the massive amounts of infrastructure required to deliver enough power to every home. That leaves centralized charging hubs which will quickly become overwhelmed and a massive time sink.
There's also no reason we can't provide charging at destinations rather than homes. Workplaces, shopping centers, etc.
Transit, trains, ebikes, etc. are all significantly more efficient, less polluting, and just better solutions all around.
Not to mention that public transportation in a lot of areas can be... Let's just say perceived as unsafe.
Hydrogen (by itself) is as clean as it can be. The byproduct is water.
Now if you’re talking plug-in hybrid hydrogen cars, that’s fine. You’ll be on pure electric 85% of the time anyway so the crazy expense of hydrogen fueling isn’t so bad.
The post was mostly about the challenges with regulations/codes. For the most part it was a plea for governments to smooth over the jankiness they introduce to the whole process. Hardly an insurmountable challenge.
Hydrogen is dead. Upgrading the existing electrical network gradually over time (EV adoption will be gradual) is going to be significantly easier than building a distribution network from (almost) scratch as would be required for hydrogen. To think the reverse is bonkers.
Converting to hydrogen makes wayyy more sense than EV infrastructure. All of the gas station can be easily converted to hydrogen stations with different pumps and tanks. A lot cheaper than running MW of power for a EV station or upgrading neighborhoods.
Then there are people that live in apartments. It isn't feasible to have a charger for every apartment at a complex. So not everyone is going to be able to charge. Even if it is a normal outlet.
There is also the fire danger. I can't even imagine the amount of damage a fire cause by an EV could do to an apartment complex.
Then there is the vandalism issue and mantaince problems involved.
Only if you are rich dose EVs make sense. But on a mass scale they make close to zero sense.
Prometheus and others have plans that may come to fruition.
Electric cars are for the rich. And of course they say it's the future and everyone should do it, without realizing it's literally impossible. No grid in the US could come close to handling that, much less in developing countries.
Not to mention due to range limitations, many people and companies are ruled out automatically.
I don't think electric is bad, or should go away. But it's not meant for the masses. I think H has a brighter future worldwide.
I could go on, but it just doesn't make sense to pin hopes on hydrogen.
The grid absolutely can handle EVs.
The range of modern EVs is totally fine for almost all cases.
The price is an issue, but even in my poor Eastern European country the number of EV exploded this year. Mainly second hand small city cars, but also others.
Are you not cooking?
Our stove needs 1kw and our oven has 6kw.
It's not crashing when everyone is cooking why would it crash when everyone is charging?
Also it costs more (energy wise) to make H and then consume it than using the energy itself. This should probably has a relevant cost saving.
Economy of scale will bring much cheaper batteries very soon. Let's say 10-20 years
Yeah no thanks.
https://www.electrive.com/2022/05/13/almost-1-3-of-san-franc...
There are... a lot of problems yet to be solved in the perfect electrified future. I hope it happens, if only to move all the pollution from cars to the power plants far away. I have found it hard to discuss the negative / illogical aspects with true believers, which is normally fine, except now the developed world is paying a shitload of taxes to fund the dreams of true believers - logic and economics be damned.