Details on NVLink would be great. For example, the needs and problems solved by their custom cables seemingly required by NVLink would be worth a whitepaper.
Don't get me wrong, this is still great the general public can get a glimpse into Grace Hopper. And they do a good job of simplifying while throwing around mind-boggling numbers (the NVLink bandwidth is insane, though no words on latency, crucial for remote memory access).
That’s what a marketing white paper is and does. It’s not an academic paper.
[1] https://www.nvidia.com/content/PDF/nvidia-ampere-ga-102-gpu-...
[2] https://www.amazon.com/Computer-Architecture-Quantitative-Jo...
I heard Elon say something interesting during the discussion/launch of xAI: "My prediction is that we will go from an extreme silicon shortage today, to probably a voltage-transformer shortage in about year, and then an electricity shortage in about a year, two years."
I'm not sure about the timeline, but it's an intriguing idea that soon the rate limiting resource will be electricity. I wonder how true that is and if we're prepared for that.
To a first approximation, the amount of silicon wafers going through fabs globally is constant. We won’t suddenly increase chip manufacturing a hundredfold! There aren’t enough fabs or “tools” like the ASML EUV machines for that.
Electricity is used for lots of things, not just compute, and within compute the AI fraction is tiny. We’re ramping up a rounding error to a slightly larger rounding error.
What will increase is global energy demand for overall economic activity as manufacturing and industry is accelerated by AIs.
Anyone who’s played games like Factorio would know intuitively that the only two real inputs to the economy are raw materials and energy. Increases to manufacturing speed need matching increases to energy supply!
Global electrical production in 2022 was ~30,000 TWh.[1]
If we over-estimate that a hyperscale data-center will consume about 100 MW of power, per year that would be around 876 GWh.[2]
Let's overestimate again and say that 1,000 new data centers spring up in a year, every year they would consume 876 TWh.
Which, is 2.92% of total electricity production. Which given the fact that I overestimated the energy consumption by more than an order of magnitude, I would say the term "rounding error" is accurate.
I think the main limiting factor in the near term is going to be chip production capacity. The fabs take so long to spin up, it's going to be a while before we can even consider "electricity production" being a limiting factor.
[1] https://yearbook.enerdata.net/electricity/world-electricity-... [2] https://cc-techgroup.com/data-center-energy-consumption/
An Nvidia A100 costs $10000 and consumes 300W.
It seems unlikely that anyone could afford the number of A100s needed to create an electricity shortage.
If there is an electricity shortage, far more likely that ageing infrastructure and rising demand for air conditioning and electric car charging are to blame.
I have hope though. CXL switching is going to give the whole industry a very fresh look at interconnect fabrics, as a simpler to manage faster more direct alternative to PCIe. Should be good.
Personally I worry it's flogging a dead horse, has too many constraints, but Ethernet could be rumbling into action again too maybe. The hyperscalers & others created a new LinuxFoundation group "Ultra Ethernet Scaling" to scale up much faster. Still, even at 1Tbps, that's a bunch of lanes (7x) of that ultra Ethernet you'd need to get to NVlink's 0.9TBps GPU interconnect. More radical breaks with Ethernet are needed than line speed bumps, things that can make switches easier to scale out big, if this realm of tech is to be good systems fabric. https://www.linuxfoundation.org/press/announcing-ultra-ether...
One interesting note on the DGX GH200 architecture that is super interesting to me is that it's inverted the connectivity relationship. Typically a system would have NIC & GPU hanging off the processor bus, and interconnect would go over that bus (maybe optimizing with p2p-dma to skip going through main memory, if it's fancy). But here? GPUs have a 0.9TBps connection to the NVswitch. If the CPU wants to talk to the cluster, it uses nvlink c2c to send the data to the gpu that then used it's nvlink connection to the NVswitch to send it out. Interesting reversal, interesting flourish, and gee it sure makes sense to me; the GPU is the thing!
Also, past 256 GPUs, there are BlueField 3 devices for Ethernet or infiniband connectivity on DGX nodes. Which is a good but also pretty boring/standard smartnic based scale out strategy.
The closest is Google with their TPUs.
Agree for now, but long do we think this will last though.
There really hasn’t been that great of a financial incentive to compete on DL. Nvidia themselves only recently made this a major priority.
However, now that heaps of money are being thrown at massive training runs I expect we’ll see more competition popping up. Particularly if Intel pulls off IFS and catches up on the next node increasing availability.
https://www.anandtech.com/show/18877/nvidia-grace-hopper-has...
[1]: (I wrote this) https://gpus.llm-utils.org/nvidia-h100-gpus-supply-and-deman...
On the LLM frontier, we’re starting to hit the limits of reasoning abilities in the current gen.
> DGX GH200 enables more efficient parallel mapping and alleviates the networking communication bottleneck. As a result, up to 1.5x faster training time can be achieved over a DGX H100-based solution for LLM training at scale.