The problem is that you could solve this by say, lowering a small pallet of whatever to the bottom of the shaft and moving it sideways out of the way - trading "power" for "energy storage".
But if you extend that idea you wind up at "pump a liquid" as the obvious way to do it, since that has essentially no limit on flow-ability.
The other problem of course it lead in the first place: 1000kg of lead at 1500m high is about 4kWh of potential energy. 1000kg of Lead-Acid batteries is about 25 kWh of potential energy. I suppose you could put the batteries on a cable for the extra 4kWh but I suspect the complexity isn't worth it.