Absolutely not. Engineering in the real world doesn't work like this. You don't design for perfection. You have intentionally defined specs set to what can be intentionally accommodated in your design.
In this case you literally have is a system operating at 1% of the value that can be accommodated. That is not a problem. Something undesirable happening does not necessarily mean the system is failing, or that it's even a practical problem.