I was recently told by an electrical engineering lecturer that the black start plan here in Ireland is to use the DC interconnectors with the UK to provide startup power to a synchronous generator.
With the new wexford-wales interconnect that went live last month, and another one planned from Cork (?) to France things might be even easier in the near future I reckon.