The grounding is usually required to meet a standard and is tested during the towers installation. There are also coaxial surge arrestors and isolators that get used along the span.
Some of the site to site communications equipment has no ground component other than a PoE switch. The ethernet interface, radio, and antenna are all in a single packaged unit installed at height on the tower.