I work in industrial embedded C. So perhaps i have weird expectations about the level of pedantry. A 10 row code change may take week to discuss, and likely require an open issue and test-case to get through.
At worst, a small 100 row code-change may require a 8000$ independent re-certification of the device before being fully pulled into master.