Well, neither of these are relevant to my original comment. I never commented on the value prop of the original install, only that your comparison in pricing is just not accurate as one is much more capable. Yes, lots of people want 34kw of standing load, because they want to ensure the offset of their HVAC unit. Generally people getting these systems have ridiculous homes, I've worked on a home with 3 20kw diesel generators. I've worked on a home with a seperate 200 amp service just for their pool side projector TV. Just because someone's wants aren't reasonable doesn't mean they don't want it.
>There are hundreds of thousands of forums and YouTube videos from DIY who rave about EG4.
EG4 sucks to try to pry anything out of. I don't actually like Sol-Ark that much either, but they're better to deal with and a better deal. Best deal is just to get an SRNE or similar straight from the source. Again, I paid $800 for my SRNE. I could get a second and parallel it and be outperforming the EG4 for a $3,400 discount. Youtubers are youtubers, not a source of truth. All those same youtubers shill battle born, too...
>Lol. And you don't even understand that specifications ratings because they very explicitly say the amps...
I'm not the one that has conflated two 50 amp phases with a 100 amp service. That's a 50 amp service. 12kw is 12kw. I keep repeating the math because you clearly keep misunderstanding it. A small electric range is typically on a 240 50 amp circuit, incredibly common in most households, and that's a small one.
>Identical system.
How is this identical? $5K for all other labor and materials? How much you paying per foot for the Class K to parallel the batteries? What's the homerun distance on the PV? Your AHJ require metal conduit on the DC runs inside the attic? Shit, if they require a 3R lockable lever disco that's $900 right there before fuses. What you penetrating with? What racking system you using? Shingle or metal roof? If shingle you doing the labor to pull shingles and put in flashing or you hacking it up with some HUGS/RT Minis? What's your max span between mounts given the wind load? S-5!s and HUGs add up fast when you can't get away with a large span. What's your interlock method? If you're landing in the MSP are you derating the mainbreaker? You value your time so little after all that material that you're still under $5k?
Edit: Also, you're gonna be paying a whole lot for LTL on that partial pallet of panels and 14' (if you get the short stuff) racking.